Glassmaking

Exhaust Gas Treatment new control system

Fume treatment - Glass (Bottles)

Cartago (COSTA RICA)

Project environment:
Fume treatment control system
Services provided:
Electrical design (NEC standards) and automation
Electrical Equipements manufacturing and FAT.
Technical assistance to customer, commissioning and operators training
Equipment implemented:
1 MCC (Frequency converter Yaskawa 250KW)
1 PLC cabinet (CompactLogix), 3 PanelView
1 SCADA (Rockwell FTView)
I/O system Nb :400

Glass industry – Electrical shelter for control and power system

Fume treatment - Glass (Floating)

Tarragone (SPAIN)

Services provided:
Electrical design and automation
Drafting of procurement and erection specifications
Electrical Equipements manufacturing and FAT.
Technical assistance to customer, commissioning and operators training
Electrical erection works sub-contracting / 3,000 hours
Equipment implemented:
Electrical SHELTER including technical room and supervision room
Power Main Distribution Panel Board + MCC (Including 2 FC SCHNEIDER 132 kw and 630 kw)
UPS, Fire detection system, climatization
1 PLC cabinet (ROCKWELL COMPACTLOGIX, FLEX I/O)
2 supervision level 2 redundant workstations (SCADA)(ROCKWELL FTVIEW)
I/O system Nb : 600