Incineration of houshold waste process renovation

We worked on the Incineration of houshold waste process during the plant shutdown. This time was used to modernise the Integrated Waste Treatment Centre CITD for Semardel in Vert le Grand.

A heat exchanger was installed on each of the plant’s two incineration lines in order to improve energy performance: a gas/water exchanger was added downstream of the exhaust fan just before the stack at the plant exit. In this context, a skid consisting of pumps and valves was also installed.

Our scope of work included :

We thank Hitachi for its trust

The key Elements :

  • Integration and programming of energy calculators ENDRESS HAUSER
  • Development of a SIMATIC COMFORT Touch Panel SIEMENS
  • Regulation and control loops for pumps and 3-way valve