Deployment of transitic systems in the United States: IESA is on board for a major project

Mise En Service de Systemes Transitiques aux USA

Deployment of transitic systems in the United States: IESA is on board for a major project

Mise En Service de Systemes Transitiques aux USA

A strategic project in the tire transitics systems market

In a context of industrial transformation and logistics automation, transitics systems play a critical role in modern manufacturing facilities. Within this framework, IESA is currently involved in a large-scale project in the United States, focused on the design and commissioning of automated systems for tire conveying operations.

This project is fully aligned with the challenges of the industrial material handling systems market, where performance, reliability, and traceability are essential to optimize production workflows.

Industrial automation and tire conveying: proven expertise in transitics systems

Design of automated transitics systems

IESA leverages its expertise in industrial automation to support its client in developing advanced automated material handling systems. These systems ensure the safe and efficient conveying of tires to various inspection and quality control stations.

Tailored solutions for industrial requirements

Through a customized engineering approach, the solutions developed meet the specific demands of the industrial sector, particularly in terms of throughput, safety, and material flow management.

Industrial simulation: a key lever to secure transitics systems performance

System validation through 3D simulation

One of the key strengths of this project lies in the testing phase using our 3D simulation platform, enabling early validation of system behavior before deployment.

Performance optimization and risk mitigation

Industrial simulation plays a critical role in this project:
Functional validation prior to deployment
Identification of potential issues and performance optimization
Risk mitigation during commissioning

Extensive on-platform testing is also conducted to ensure system robustness and operational reliability.

Phased deployment through on-site commissioning

The project includes a phased commissioning strategy for the material handling systems, scheduled between 2025 and 2027. This approach ensures a controlled and smooth integration into existing production environments.

IESA is currently engaged in a key milestone: the on-site commissioning of the first system in the United States. This phase brings together all prior work in engineering, simulation, and testing.

An international collaboration driving industrial performance

This project is delivered in collaboration with Giordano C&S S.p.A. and Giordano USA, recognized players in the material handling industry.

IESA thanks them for their continued trust, reflecting the company’s ability to deliver complex industrial projects on an international scale.

IESA, your partner for industrial automation and material handling systems

Through this project, IESA confirms its expertise in industrial automation and industrial simulation, as well as its ability to support clients on strategic material handling projects.

From engineering design to on-site commissioning, IESA teams deliver innovative, high-performance solutions tailored to the needs of today’s industrial operations.

Do you have a project in industrial automation or industrial simulation? Contact our teams!

To learn more about our expertise in the logistics and material handling market, click here