Wastewater Treatment in ALGERIA

We carried out the design « Automation and Electricty » in a wastewater treatment in Algeria.

The conception and realization part of the electrical package included the supply of High Voltage cells (30 kV) and 2 transformers (2×800 kVA).

We realized the electrical works procurement of this installation (4 000 hours).

We performed the commissioning phase and provided technical assistance for the operators.

The Key Elements :

  • Electrical Works Procurement
  • HV Substation 30 kV
  • Transfomers 2×800 kVA
  • Main Low voltage Board and MCC Cabinets
  • 2 PC of supervision