Waste Treatment Plant – Handling Bridge – REUNION

Our experts in industrial engineering simulation were consulted for a new Waste Treatment Plant in the Reunion Island.

Our objective : to  recreate the process environment with our Plug’n Test® tool to validate the operation of the 13 RMIS “R-Stock” bridges of the installation.

Our team carried out the development from CAD drawings, then integrated the operation and the movements of the bridge (speed for example) managed by the Schneider M340 PLC.

They also integrated the physical behaviour of the bulk material to be handled (resistance in particular).

We thank our customer for his confidence.

The key elements :

  • Material management in the Plug’n Test® Tool (resistance)
  • Plug’n Test® Emulator
  • M340 Schneider PLC
  • 100 I/O