Tunnel Segment Erector – Segment supply bridge – sewers construction

Within the framework of sewers construction for Doha in Qatar, our experts intervened in programming of a bridge crane. 

Our scope of works included :  

  • Restriction area programming  
  • Cycle times optimisation 
  • Exchange between surface and downhole operators   
  • Bridges simulation to test without disrupting production   
  • Installation of 4G remote control routers 
  • Commissioning in Doha, Qatar 

A sucessfully challenge : all modifications were made without stopping production  

The Key Elements : 

  • Quick integration into customer teams 
  • Cycle times optimisation 
  • Continuity of production during tests and modifications 
  • Configuration and installation of 4G Ubiquity routers 
  • Plug’n Test  

#IESAAutomation #TBM #TunnelBoringMachines #Tunneliers #PlugNTest #SimulationProcess #Simulation3D #RéalitéVirtuelle #VirtualReality #Emulators #IndustrialEmulators #HydrauliqueSimulation #TunnelSegmentErector #PontAlimentationVoussoirs #Routeurs4GUbiquity #ConstructionDesEgouts #SegmentSupplyBridge #SewersConstruction