Loading Arms – Liquefied Natural Gas Process – South Korea

In South Korea, we worked on Loading Arms of an offshore storage platform. This LNG plateform will be docked off the coast of Jordan.

We designed ATEX-compliant electrical system, and supplied all the necessaries boxes and cabinets : control panels stainless steel, electrical boxes (EExd), intrinsically safe junction boxes, power supply (EExe), control box (EExe), radio remote control, PLC cabinet, supervision station.

After delivered the material and realized the necessary tests, we carried out the installation commissioning phase on the shipyard site.

The Key Elements

  • ATEX Equipment (Area 2 II A T3)
  • 1 PLC 315F-2 DP
  • Supervision WinCC

#IESAAutomation #ElectricitéIndustrielle #Commissioning #ArmoirePLC #BoitesDeJonctionSecuritéIntrinseque #CoffretElectrique #ATEX #LoadingArms #LNG #LiquefiedNaturalGas #Oil&Gas #CPU 315F-2 DP #EExd #EExe #Zone2IIAT3