Green Anode Paste Plant – Aluminium – Saudi Arabia

In Saudi Arabia our automation engineers installed PLC, IHM and SCADA in two Green Anode Paste Plants (GAP) at an aluminum factory.

After developing the automation and the installation process over a period of 1 year, we proceeded to the necessary tests and conducted the entire commissioning phase.

Our scope of work also included operational technical assistance.

The key Elements :

  • PLC, IHM and SCADA development
  • 2 000 I/O